Application User Manual 2.0
Signup Go to Store
  • Overview
  • App Documentations
    • Goods Inbound
      • Purchase Order Calendar
      • Sampling
      • Quality Control
      • Goods Receiving
      • Certificate of Analysis
    • Scheduler and Events (Pre-Production)
      • Production Scheduler
      • Event
        • Shift Master
        • Shift Model Master
        • Production Line Master
        • Event Calendar
        • Downtime Category
        • Downtime Configuration
    • Production
      • Digital Work Instruction (DWI)
        • DWI - Production Order Execution
          • Step 1. Maintain SOP & QSOP
            • 1.1 Configure QSOP
              • 1.1.1 How to add QC Group & Sampling Instructions
            • 1.2 Configure SOP
            • 1.2 How to Approve / Reject / Activate SOP
            • 1.3 How to Approve / Reject /Activate QSOP
            • SOP Preview
            • QSOP Preview
          • Step 2.Create Work Order
            • 2.1 Work Order Creation in HMI
            • 2.2 Work Order excel template upload
            • 2.3 Work Order - ERP Sync
          • Step 3. Production Scheduler
          • Step 4. Approve Tool Request
            • 4.1 Tool Assembly
          • Step 5. Kanban Movement
          • Step 6. HMI- Execution
          • Lab QC
          • Machine Configuration History
          • Traceability View
          • Process Sequencing
    • Goods Outbound
    • Maintenance
      • Maintenance time interval
      • Schedule maintenance without SOP
      • Total Productive Maintenance (TPM)
        • Maintain TPM SOP
        • Approve, Reject & Activate TPM SOP
        • TPM SOP Preview
        • Maintain Object Explorer (Master)
        • Maintain and Schedule TPM Activity
        • How to execute TPM activity
      • TPM SOP- Excel template upload
    • Master Data
      • Machine Master
      • Activity Master
      • Procedure Type Master
      • Component Type Master
      • Component Master
      • Check List
      • User Master
      • Group Master
      • Reason Master
      • Material Master
      • QR Code Generator/Scanner
      • Shift
      • Product Master
      • Tool Master
      • Tool Life Cycle
      • Production Line Master
      • Packaging Rule Master
      • Kanban Master
      • Image Lab
      • Operations Master
      • Downtime
      • Revert
      • Handling unit
      • Manufacturing SOP
        • Quality SOP
        • Manufacturing SOP
        • Checklist Master
        • TPM SOP
    • Print Label
  • PATCH Operation in Transaction
Powered by GitBook
On this page
  • Step 1: Go to Tool Shop
  • Step 2: Click on Approve Tool Request
  • Step 3: Click on the orange arrow
  • Step 4: Go to PENDING tab
  • Step 5: Approve or Reject
  • Step 6: When he approves the tool request, the order in the scheduler gets green
  1. App Documentations
  2. Production
  3. Digital Work Instruction (DWI)
  4. DWI - Production Order Execution

Step 4. Approve Tool Request

Supporting app comes along with Tool Shop

PreviousStep 3. Production SchedulerNext4.1 Tool Assembly

Last updated 2 years ago

Now the tool shop has to approve, if the tool will be available on the requested date for the order.

Step 1: Go to Tool Shop

Step 2: Click on Approve Tool Request

Step 3: Click on the orange arrow

Step 4: Go to PENDING tab

  • Tool Approval screen will displayed as below, by default PENDING tab will be selected

Step 5: Approve or Reject

Now the tool shop operator can approve or reject the request

  • Click on Approve button to move request to Approved Status

item will be moved to APPROVED tab

  • Click on Reject button to move request to REJECTED Status

item will be moved to REJECTED tab

Here user will be get REVERT button to move tool status to PENDING status

Step 6: When he approves the tool request, the order in the scheduler gets green

Once the scheduling is completed we can proceed with the Kanban Movement.

The tool request will be approved automatically if the work order is created from HMI with schedule enabled.

But if we use production scheduler then we need to manually approve the tool request add do the Kanban delivery.