Step 3. Production Scheduler
add on app
Last updated
add on app
Last updated
Work orders needed to be scheduled can be integrated to this app from the existing ERP / Excel or manual upload and will be displayed as cards. User can drag the work order cards into the desired date and schedule.
In order to schedule a work order follow below steps.
Work Order can be created from any one of the below process
Here the planner schedules a work order 19064 in the machine 80T-2 and uses the tool AC25-P5.
Result